|
Build Your Online Product Catalogs?
Product Name: |
SH-FL958G Wheel Loader
|
Supply Ability: |
|
Related proudcts |
|
Specifications |
Amplified hydraulic steering with priority ;Double-pump combined |
Price Term: |
FOB |
Port of loading: |
Qingdao |
Minimum Order |
|
Unit Price: |
|
|
MAIN PERFORMANCE
Rated load .5000Kg Operating weight 17100Kg Rated bucket capacity ...3.0m3 Max.breakout force ..165 KN Staic tipping load 10000Kg Max.dump clearance3180mm Dump reach.1180mm Dump angle.... ¡Ý45¡ã Outside of bucket 5920mm Min. turning radius Outside of rear wheel5000mm.
ENGINE
Model .WD61576G3-36 Type6 cylinder, water -cooled , turbocharged. Total power...162Kw Max.torque...843N.m Number of cylinders......6 Bore and stroke..121mm¡Á152mm Total displacement10.45 L Alternator.......28v, 1400W Starting motor........ 24v, 7.5KW Battery........160Ah Fuel consumption......... 235g/Kw.h (Option: Weichai Styre WD615 engine) TORQUE CONVERTER Torque converter. ZF WG 200 Torque stall ratio..4.0 Cooling method..Forced circulation type
TRANSMISSION
TransmissionZF WG 200 Power shift transmission Gear F Km/h RKm/h 1 6.5 6.5 2 11.5 11.5 3 24 24 4 39
AXLE SYSTEM
Type..4WD Mount..Rigid front axle, oscillating fear axle Tires.. 23.5¡Á25-12 Final reduction gear. Vertical column gear, planetary reduction. Swayed angle¡À11O (Option: ZF axles with wet type disc brake)
BRAKE SYSTEM
Service brakes..4 wheel, dry type disc brake. Parking/Emergency brake..hoof type.
SERVICE REFILL CAPACITY
LOCATION.. LITERS Water tank..23 Fuel tank.. .. 280 Sump(engine oil) .. 22 Front axle(gear oil) .36 Rear axle(gear oil) ..36 Torque converter and Transmission(gear oil) .45 Hydraulic system(hydraulic oil) .210 Brake oil tank4
HYDRAULIC AND STEERING SYSTEM
Frame type.Articulated frame steering Steering mechanism.Amplified hydraulic steering Lifting cylinder..Double-acting piston: 2-160¡Á794 Dumping cylinder. Double-acting piston:. 1-180¡Á540 Steering cylinder. Double-acting piston: 2-90¡Á485 Main oil pump.100ml/r, 2200r/min Steering oil pump134.4ml/r, 1680r/min Relief valve set pressure lifting 20*** Steering 16*** Hydraulic cycle time(second): Lifting(full load) ... 5.7 Lowering (empty) .. 3.9 Dumping.. ...1.0 Total...10.6
|
Company: |
Shenghan Trading CO.,Ltd.
|
Contact: |
Ms. leslie wei |
Address: |
NO.276,Beigong East Street |
Postcode: |
261031 |
Tel: |
86-536-8213377 |
Fax: |
86-+536-8213399 |
E-mail: |
|
|
|
|